Saturday, January 31, 2009

Day 5 (Friday)

Rick finished the electrical work for the oven and microwave, and Dick touched up some more of the painting.

Some of the cabinets were installed today, with very few glitches, except for the electrical recepticals which were inadvertantly left in a hole in the wall...and had to be fished out after the cabinet was bolted to the studs.

I don't know, looks to me like Barry is trying to hide something, doesn't it?


Rich, Hal and Barry did most of the work installing cabinets which John Finch programmed and Hal put together. These cabinets are as good as you'll find anywhere. Solid wood, seriously strong joints, nice finish. Couldn't have found better anywhere.

Below is a look at the first wall of cabinets with the microwave and oven range.


Below is the cabinet where we store children...I mean, it's a demonstration of the quality of craftmanship. Not sure what has been done as parents to make these kids think that sittin in a cabinet is desirable, but we'll work on that. Look at those smiles! Maybe we should all sit in a cabinet from time to time.

I'll update things on Monday. Have a great weekend!

No comments:

Post a Comment